Work to improve the Lake Ridge trail along the Occoquan reservoir was underway in December 2016. Equipment and materials were delivered to the staging area on December 2, 2016, by the company employed to complete the work (under supervision of the PW County Parks Dept). The work includes installing culverts and restoring the trail surface at two erosion sites (sites 4 and 5), on the trail near Critton Circle / Collingwood Court. By December 18, a significant portion of the work had been completed. These pictures show the conditions at sites 4 and 5 prior to the trail work, and conditions after the trail work had been started.